Cap, SDR 11
Cap MV SDR 11
- Gas, water and H2
- Working pressure: MOP (gas) 10 bar, PFA (water) 16 bar
- Material: PE 100
- Safety technology
- DVGW test mark: DV-8601AU2248 and DV-8606AU2249
- FM Approvals Class: 1613 (d 63 - d 225)
PE 100 SDR 11
Maximum permissible working pressure 16 bar (water) / 10 bar (gas)
Reference | d | BX | PU | D | L | t | h | B | Weight kg |
---|---|---|---|---|---|---|---|---|---|
612025 | 20 | 50 | 2500 | 31 | 62 | 41 | 22 | 46 | 0,040 |
612026 | 25 | 50 | 2500 | 35 | 65 | 41 | 22 | 51 | 0,040 |
612027 | 32 | 60 | 1920 | 44 | 70 | 44 | 24 | 61 | 0,060 |
612028 | 40 | 50 | 1600 | 55 | 75 | 49 | 28 | 70 | 0,090 |
612029 | 50 | 30 | 960 | 67 | 80 | 55 | 30 | 80 | 0,120 |
612030 | 63 | 20 | 640 | 84 | 88 | 63 | 31 | 96 | 0,210 |
612031 | 75 | 20 | 640 | 99 | 99 | 70 | 31 | 110 | 0,320 |
612032 | 90 | 16 | 288 | 118 | 114 | 79 | 40 | 130 | 0,530 |
612033 | 110 | 12 | 216 | 143 | 125 | 82 | 34 | 153 | 0,850 |
612034 | 125 | 8 | 144 | 163 | 135 | 87 | 42 | 168 | 1,180 |
612035 | 160 | 10 | 60 | 208 | 160 | 98 | 54 | 210 | 2,370 |
616183 | 180 | 6 | 48 | 224 | 157 | 100 | 46,5 | 225,5 | 2,800 |
616184 | 200 | 4 | 32 | 250,6 | 167 | 103 | 48 | 253 | 3,700 |
616185 | 225 | 4 | 32 | 279 | 184 | 114 | 48 | 281,6 | 3,950 |
FRIALEN safety fittings can be fused with SDR11 - SDR17.6 pipes. Other levels of SDR can be processed on request. Please note the mandatory labels directly on the product. DVGW test marks issued: DV-8601AU2248 and DV-8606AU2249
Areas of Application
The FRIALEN-End Caps MV are used to close HD-PE pipe ends.
Also recommended as fused caps (d32 and d40) for the dome of FRIALEN-Pressure Tapping Tees DAA and DAP up to d63.
Assembly Instructions
The fusion of a pipe end or the dome of a FRIALEN-Pressure Tapping Tee with the FRIALEN-End Cap MV takes place using FRIALEN-fusing – leakproof and longitudinally strong.
The fusion area is prepared according to the general installation instructions (see “Assembly Instructions” for “FRIALEN-Safety Fittings for house connections and distribution pipes up to d 225”). This involves removing the oxide skin and cleaning the pipe ends. Next to moulded fittings and accessories it is recommended to install a piece of pipe of 20 - 60 cm length, accordingly to the diameter, so that the pipeline can be continued later on.
Good reasons for using the FRIALEN-End Caps MV:
- Large coupler depth for ease of pipe guiding (no holding clamps required)
- Extra wide fusion zones
- Maximum stability through great wall thickness
- Cold zones at the front side and in the middle of the coupler
- Exposed heating coil for direct heat transmission to the pipe
- Small annular gap for build-up of optimum joining pressure in the fusion zone
- Touch proof electric contacts
- Fusion indicator for visual fusion control
- Durable batch marking
- Individually wrapped for dirt protection
- Additional barcode for tracing back the fitting (Traceability-Coding)